Clarity Before Construction

Demolition & Remediation Surveying

Demolition & Remediation Surveying

Environmental and energy projects in the North West present survey challenges that standard construction methodology cannot always address. Wetland sites where ground-based access is restricted or harmful to the habitat. River corridors where the data needed lies beneath the water surface. Wind farm and solar development sites across challenging Pennine, Lakeland and moorland terrain. Flood risk assessments where every level and drainage feature matters to the modelling. Water infrastructure upgrade schemes operating under AMP8 investment where the survey data directly underpins programme-critical design decisions.

Site Surveying Services has been delivering survey across this sector since 1997 — using UAV LiDAR, unmanned surface vessels, remote sensing and GPS-controlled ground survey to capture data safely and accurately in environments where traditional methods are impractical, too slow or potentially damaging to what is being surveyed. We are Lancashire-based, nationally capable, and our equipment is specifically chosen for the environments this sector demands.

Environmental & Energy
Public Sector & Services
Defence & Justice
Rural & Agriculture
Bathymetric & Hydrographic
Commercial & Retail
Architecture & Project Management
Heritage & Cultural Restoration
Industrial & Logistics
Housing & Development
Infrastructure, Roads & Highways
Demolition & Remediation
Construction & Civil Engineering
The Challenge:

Surveying for Demolition and Remediation Projects

Surveying for Demolition and Remediation Projects

Demolition and remediation projects carry inherent risks...

…from unstable structures and unknown utilities to environmental hazards and access restrictions. Without accurate, up-to-date data, teams face uncertainty that can result in safety incidents, programme delays, or costly redesigns. Developers and contractors need absolute clarity before works begin – an understanding of every structural, environmental, and subsurface condition that could impact safety and success.

Why Accuracy Matters...

Accurate survey data is essential in helping to protect ecosystems and supporting sustainability goals. With reliable information, clients can:

Identify hazards early

Detecting structural weaknesses, contamination zones, or utility conflicts before mobilisation.

Plan safe access routes

Mapping clear working zones, exclusion areas, and haulage routes.

Optimise remediation design

Using detailed models to guide excavation, drainage, and earthworks strategies.

Stay compliant

Providing essential documentation for health, safety, and environmental assessments.

Support redevelopment

Delivering precise data that transitions smoothly into the design and construction phase.

Innovation in Action

Innovation in Action

Through remote scanning, drone mapping, and integrated 3D models, we give clients visibility into sites that would otherwise be high-risk or inaccessible.

These technologies reduce the need for manual inspection, enable safer planning, and ensure compliance with environmental and demolition regulations – transforming how projects are managed from first survey to final clearance.

The current query has no posts. Please make sure you have published items matching your query.

Our Services

Why choose site surveying services

On site. On spec. On time.

fast turnaround

Get a quick quote and a survey team prepared for instruction. When the programme window opens, we're ready.

PAS 128 Accredited

British Standard utility mapping. Quality Level B means physical verification of every service - not just surface evidence.

Lancashire-Based

Headquartered in Clitheroe. We know the North West - the sites, the contractors, the programmes. Local knowledge backed by national capability.

Programme-Critical

Data that works in your environment from day one. BIM to your EIR. CAD to your spec. No reprocessing. No delays to the design team.

Frequently Asked Questions

Frequently Asked Questions

What survey is required before a demolition programme begins?

Pre-demolition survey typically requires a combination of services depending on what is being demolished, what is being retained, and what the site will become after demolition. Measured building survey of the existing structures before demolition begins — providing the record that satisfies the planning authority’s requirement and protecting the contractor if any dispute arises about the pre-demolition condition of the building. PAS 128 utility mapping before any groundworks associated with the demolition programme — particularly important on brownfield sites with complex buried service histories. Topographic survey of the site before and after demolition for cut and fill and earthworks assessment. Monitoring of adjacent structures where demolition activity creates movement risk for neighbouring buildings.

Brownfield sites and sites with existing structures carry the highest risk of undocumented buried services of any site type. Decades of service modifications, decommissioned service runs abandoned in place, undocumented connections between systems and services not represented in any statutory record are all common on brownfield land. PAS 128 Quality Level A — physical verification using vacuum excavation — is the appropriate standard before any demolition-associated groundworks on these sites. A service strike during demolition groundworks has the same consequences as one during construction. The standard that protects the programme applies equally to both.

Yes. A pre-demolition measured building survey produces a complete record of the existing structure before demolition — floor plans, elevations, sections and in some cases a laser scan point cloud — providing the documentary evidence that satisfies planning condition requirements, supports heritage recording where the building has historic significance, and protects the contractor in the event of any dispute about the pre-demolition condition. For listed buildings or buildings in conservation areas where demolition requires consent, the measured building survey is typically a condition of that consent.

Where demolition takes place in proximity to existing occupied buildings, structures or infrastructure, monitoring is required to detect and document any movement caused by the demolition programme. Settlement monitoring of adjacent structures, crack monitoring of existing fabric and vibration monitoring from demolition plant are all appropriate depending on the proximity, the sensitivity of adjacent structures and the demolition methodology. The trigger levels and monitoring programme should be specified by a structural engineer and implemented before demolition begins — not after movement is suspected.

We survey on sites where ground contamination is a known or suspected risk, adapted to the specific hazard profile. Where site investigation has identified contamination, we review the Phase 1 and Phase 2 environmental reports before mobilisation and produce method statements that reflect the specific hazard controls required. We do not carry out intrusive investigation of contaminated land — that is a specialist environmental engineering activity. We carry out topographic survey, UAV survey, laser scanning and other non-intrusive survey methodologies on sites where contamination is present, subject to appropriate hazard controls.

UAV survey is particularly useful for demolition and remediation in three specific applications. Pre-demolition site survey — rapid capture of the existing site conditions before demolition begins, including the roofs and upper facades of structures that ground-based survey cannot efficiently capture. Volumetric survey during remediation — tracking earthworks progress, material removal volumes and stockpile quantities throughout the remediation programme. Post-demolition as-built — confirming that demolition and remediation have achieved the required outcomes against the design specification.