Settlement monitoring is typically required during and after construction on earth embankment flood defences to verify that the new structure is performing as designed and that there is no unexpected movement or settlement. Monitoring may also be required on existing structures adjacent to flood defence works — culverts, walls, bridges — to detect any movement caused by construction activity. Our monitoring programmes use automated instrumentation providing real-time data and clear reporting, giving engineers and asset managers early warning of any movement before it becomes a structural issue.
Leeds
Doncaster
Sheffield
Bradford
Hull
Halifax
Sunderland
Newcastle
Middlesborough
Yorkshire Moors
Teesside
Cumbria
Harrogate
York
Yorkshire Dales
Goole
Carlisle
Keswick
Kendal
Barrow-in-Furness
Lancaster
Blackpool
Morecambe
Southport
Liverpool
Wigan
Manchester
Blackburn
Burnley
Forest of Bowland
Oldham
Chester
Stockport
Peak District
Skipton
Crewe
Rotherham
Stoke
Driffield


